February 25, 2026
8
Min reading

Les tariffs for the use of public electricity networks (TURPE) represent almost a third of the total electricity bill. Its latest developments have had an upward impact on the energy bill of businesses and individuals.
But what is the purpose of this rate? How is it calculated? Who fixes it? What are the economic mechanisms that make it up? Can it be optimized to reduce the amount of the energy bill? What TURPE applies today and what evolution is expected in 2025 with the new TURPE 7? Lighting
TURPE is used to finance the transport of electricity from production centers to consumers. More specifically, it covers the costs of investments in public electricity transmission and distribution networks.
In France, the management of public electricity networks is under the responsibility of RTE for transport, and ofEnedis And Local Distribution Companies (ELD) for distribution.
In particular, these companies have the following missions: maintain, develop and modernize electrical networks in order to guarantee the security of supplies.
Deducted directly from consumers' electricity bills, TURPE finances these public service missions. Network operators receive all TURPE revenues, calculated as closely as possible to their needs by the Energy Regulatory Commission (CRE).
It is their main source of income to invest. Operators do not make any profit from these monopoly activities.
The TURPE is available in two rates:
The TURPE is governed by the CRE as part of its mission to regulate energy networks. The objective: to guarantee the quality of the public electricity service, while maintaining fair prices and tariffs, both for network operators and for consumers.
TURPE is based on 4 fundamental principles that define its structure and calculation method:
Beyond these principles, TURPE is calculated on the basis of two structural elements: the tariff structure and the level:
The rate structure varies from one TURPE period to the next, i.e. every four years. The level is adjusted every year on 1 August, to take into account inflation, the annual evolution of costs and the regulation of the charges and products of network operators (CRCP). The latter must justify to the CRE the increase in their costs in order to hope to benefit from a price increase.
The choices of the structure and level of TURPE are the result of collective work and regular dialogue between CRE, network managers and users. The discussions revolve around several public consultations organized over several months, punctuating the work of building the tariff.
The TURPE tariff is proposed by the Commission de Régulation de l'Énergie for a period of four years. It is published in the Official Journal after approval by the government.
To calculate the TURPE, CRE experts proceed in 4 steps:
For example, HTB1 users will have to pay for one MW of power 83% of the unit cost of the HTB2 network and 76% of the unit cost of the HTB3 network.
The TURPE is paid by all final electricity consumers, directly on their bill. Its calculation depends on the type of customer and their consumption profile.
For residential consumers, as well as for the majority of professionals and businesses, the TURPE is integrated directly into the electricity bill. The amounts collected by energy suppliers are paid in full to electrical network managers, beneficiaries of TURPE.
The portion of the electricity bill corresponding to the delivery is the same regardless of the energy supplier.
Some companies pay TURPE directly to their network operator., without going through the supplier. These are large electricity consumers who have concluded a CARD contract (distribution network transmission contract) or CART (transmission network transport contract) contract.
The TURPE is calculated from several rate components.
For individuals and businesses with a meter power of up to 36 kVA, three tariff components are taken into account:
For powers greater than 36 kVA, TURPE takes into account other price components, depending on the company profile and options:
TURPE is one of the elements of the electricity bill on which businesses can act to reduce their energy budget.
Every professional customer must opt for a tariff version of TURPE for its electricity contract (short use — CU, medium use — MU or long use — LU).
This choice influences the cost of transporting electricity and the price per kWh., depending on the consumption profile. For example, a company that consumes electricity regularly, regardless of the time of day, week, or year, has every interest in choosing the long-use version of TURPE.
Achieve a Optimization calculation based on the history of electrical consumption helps determine the most appropriate delivery rate formula (FTA) for your business.
When taking out its electricity contract, the company must also choose the subscribed power necessary to cover its consumption needs. Overestimating this power increases the cost of the bill.
One study based on the historical consumption curve allows all possible power combinations to be tested until the most relevant one is identified. It is possible to change the power subscribed to at any time during the life of the contract. The request must be made to the energy supplier who transmits it to Enedis or to the local ELD.
An energy consulting firm, SirEnergies offers its expertise to companies to choose the tariff version of TURPE and the subscribed power adapted to their needs, optimize the amount of their electricity bills and save money.
TURPE 6 has been in force since August 1, 2021 and until August 1, 2025. After an average increase of 6.51% in TURPE HTA-BT and 6.69% in TURPE HTB in 2023, TURPE should continue to rise in 2024, with a more marginal impact on the electricity bill. A stronger increase is expected in 2025, with the entry into force of the new TURPE 7.
At the end of 2023, the CRE initiated the public consultations to set future rates TURP 7 , which will apply from 2025 to 2029. The stakes are high.
On the one hand, public electricity networks are aging, requiring investments to upgrade and secure. On the other hand, the energy transition requires the evolution of a more flexible electrical system.
Infrastructures must be in a position to accommodate the increasing production of renewable electricity and to meet new needs (electric mobility, electrification of industry and heating...)
In its first consultation on the tariff structure of TURPE 7, the CRE submits, for example, the possibility of changing the off-peak and peak hours. Among the approaches studied, the seasonality of off-peak hours. They could be increased in summer to encourage consumption when renewable electricity production is at its peak.
They could also be eliminated on certain time slots in winter during which the balance between electricity supply and demand is threatened.
The CRE is also studying the possibility ofintroduce a new racking/injection pricing for the batteries in order to better exploit storage capacities for the benefit of the network.
It's going to be a difficult challenge. The aim is to determine a balanced TURPE rate that will allow meet investment needs in public electricity networks, while maintaining an accessible electricity price for consumers. Experts have the year 2024 to solve the equation.

.png)
Oui, elle est considérée comme une énergie renouvelable à faibles émissions de gaz à effet de serre.
De plus, l'eau ne subit aucune transformation chimique durant le cycle de production et réintègre son milieu naturel en aval.
Cependant, la construction de barrages nécessite des mesures pour protéger les écosystèmes (débit minimum, passes à poissons).
.png)
Non. L'IA traite la donnée (data processing), mais l'analyste apporte la compréhension du contexte (market sentiment) et la prise de décision stratégique.
.png)
Among the taxes include TICFE, TICGN, CTA, CJA and TURPE. They represent a significant part of the bill and vary according to consumption profiles. Understanding them well is essential to optimize costs.
.png)
Le kVA mesure la capacité maximale que votre compteur peut supporter à un instant T, tandis que le kWh mesure la quantité d'énergie consommée sur une durée.
.png)
These are signals sent by RTE during periods of tension on the electrical network. The Sirenergies tool informs you in real time to anticipate your uses.
.png)
Le processus repose sur l'utilisation de la force de l'eau (énergie cinétique) issue des courants, des chutes d'eau ou des dénivelés. Le fonctionnement suit trois étapes clés :
.png)
Exceeding capacity leads to financial penalties and can impact the size of the contract. Adjust the correctly subscribed power makes it possible to avoid these additional costs.
.png)
The industry is concerned by TICFE, TICGN and other contributions that may represent an important part of invoices. Sirenergies identifies cases of exemption and accompanies the procedures to benefit from them.
.png)
Ce seuil est jugé élevé par rapport aux prévisions actuelles du marché. Si le prix de l'électricité reste en dessous de 78 €/MWh, les entreprises ne bénéficieront d'aucune redistribution. Cela signifie que la protection promise par la réforme pourrait être inexistante dans un marché baissier, d'où l'importance de stratégies de sourcing agiles et d'outils de monitoring comme Pilott.
.png)
The subscribed power must be calculated according to the consumption profile and uses (heating, industrial processes, tertiary equipment). One fine analysis makes it possible to ensure the adequacy between real need and contract.
.png)
Chaque modèle d'IA répond à un besoin spécifique du cycle d'achat :
L'expertise humaine reste néanmoins indispensable.
.png)
L'abondance de production française tire les prix du marché de gros vers le bas.
En vertu du mécanisme de l'Ordre de Mérite (Merit Order), les centrales les moins coûteuses (nucléaire, renouvelables) couvrent la demande plus souvent, évinçant les centrales à gaz ou charbon plus onéreuses.
Cela multiplie les épisodes de prix bas, voire négatifs, sur le marché spot.
.png)
La réussite d'un projet collectif énergie repose sur trois piliers fondamentaux :
.png)
Le prix Forward est fixé à l'avance (sécurité budgétaire), tandis que le prix Spot varie heure par heure selon le marché (opportunité mais risque élevé).
.png)
Farms must deal with high seasonal needs (greenhouse heating, irrigation, storage) and high volatility of prizes. Controlling these costs is essential to maintain profitability and secure the business.
.png)
La fin de l'ARENH (Accès Régulé à l'Électricité Nucléaire Historique) marque l'arrêt de la fourniture d'électricité à prix fixe garanti (42 €/MWh).
Dès le 1er janvier 2026, les entreprises sont exposées aux prix de marché, mais deux nouveaux mécanismes de régulation prennent le relais, bien que leur logique soit différente :
Conseil stratégique : Ne comptez pas sur le VNU pour réduire votre facture en 2026 si les marchés restent stables. Auditez vos contrats dès maintenant pour intégrer une part de prix fixe ou explorer des "Power Purchase Agreements" (PPA) pour sécuriser vos coûts sur le long terme.
.png)
Car les marchés dépendent de facteurs exogènes imprévisibles (géopolitique, météo soudaine, politique) que les modèles basés sur l'historique ne peuvent pas anticiper, tout comme on ne prédit pas le Loto.
.png)
Tertiary companies are concerned by taxes such as TICFE or TICGN. Sirenergies checks the accuracy of invoices, identifies possible exemptions, and helps correct errors to sustainably reduce costs.
.png)
En 2025, la France a atteint un solde exportateur net de 92,3 TWh, battant le précédent record de 2024 (89 TWh).
.png)
En 2026, les principaux leviers sont : la renégociation de votre contrat de fourniture au bon moment, l'optimisation de votre tarif d'acheminement (TURPE), la vérification de votre éligibilité aux taux réduits de taxes (Accise), et la réduction de votre consommation (efficacité énergétique, autoconsommation).
.png)
C'est l'indicateur d'efficacité d'un appareil électrique ; il représente le ratio entre la puissance active (utile) et la puissance apparente (totale).
.png)
Industrial companies consume large volumes of energy for their production processes. They have to deal with the volatility of prizes, multi-site management and specific taxes. Controlling costs is essential to remain competitive.
.png)
Le transport (RTE) correspond aux "autoroutes" de l’électricité. Il s’agit de transporter de très grandes quantités d'énergie sur de longues distances, depuis les centrales de production (nucléaires, barrages, parcs éoliens offshore) vers les régions de consommation.
La distribution (Enedis) s'apparente aux "routes départementales" et aux rues. Elle récupère l'électricité à la sortie du réseau de transport pour la livrer directement chez le client final, en abaissant la tension pour qu'elle soit utilisable par vos appareils.
.png)
One invoice consists of several elements: consumption, supplier share, taxes and contributions. The analysis of each line makes it possible to identify possible errors and to check the consistency with the signed contract.
.png)
Absolument. La réforme des heures creuses vise à absorber la surproduction solaire en milieu de journée. Les créneaux d'heures creuses se déplacent progressivement vers la plage 11h00 – 17h00, notamment en été. C'est une opportunité majeure pour les sites industriels ou tertiaires capables de flexibilité.
Conseil stratégique :
.png)
Instauré en 2017, ce dispositif répond à un enjeu de sécurité nationale.
L'électricité ne se stockant pas à grande échelle, le réseau doit être capable de répondre instantanément à la demande, même lors des pics de froid hivernaux. Le mécanisme incite financièrement les producteurs à maintenir leurs centrales disponibles et les entreprises à réduire leur consommation (effacement) lors de ces périodes critiques.
.png)
Parce que la puissance souscrite en kVA détermine le prix de l'abonnement et que tout dépassement peut entraîner des surcoûts importants.
.png)
En analysant votre courbe de charge pour identifier la puissance réelle appelée, puis en demandant un ajustement à votre fournisseur ou via un expert en énergie.
.png)
Pas nécessairement sur votre facture finale. Si les prix de gros (le prix de l'énergie brute) ont baissé, les coûts d'acheminement (TURPE) et certaines taxes augmentent, compensant souvent la baisse de la part énergie.
.png)
Sourcing consists in identifying and analysing the offers of several electricity and gas suppliers. This approach makes it possible to obtain contracts adapted to the consumption profile and budgetary constraints of the company.
.png)
La Vente de Nucléaire Universelle (VNU) est le nouveau mécanisme de régulation des prix de l'électricité en France. Contrairement à l'ARENH, il ne s'agit plus d'un volume fixe à prix réduit, mais d'une redistribution financière des revenus excédentaires d'EDF aux consommateurs, basée sur les prix de marché et les coûts de production du nucléaire historique.
.png)
Un appel d’offres permet de mettre en concurrence plusieurs fournisseurs d’électricité et de gaz afin d’obtenir des conditions contractuelles optimisées. C’est une démarche transparente qui permet de choisir l’offre la plus adaptée aux besoins budgétaires et techniques de l’organisation.
.png)
This makes it possible to choose the right time to contract, secure your budgets and anticipate increases.
.png)
Sourcing offers better visibility on the market and promotes the selection of competitive contracts. It helps to reduce the risks associated with price volatility and to optimize the energy budget.
.png)
Changing suppliers can allow you to benefit from more competitive prices, adapted services or better contractual conditions. Thanks to sourcing, change is happening without interruption of supply.
.png)
Idéalement entre 6 et 12 mois avant l'échéance, de préférence au printemps ou au début de l'été lorsque la demande est plus faible.
.png)
Communities are subject to taxes such as TICFE or TICGN. Sirenergies analyzes invoices, identifies exemption possibilities and fixes possible errors to reduce the tax burden.
.png)
L'impact dépendra des prix de marché. Le mécanisme prévoit une redistribution si les prix dépassent 78 €/MWh. Cependant, si les cours restent bas (actuellement autour de 60 €/MWh), le dispositif ne s'activera pas. La facture sera alors indexée à 100% sur les prix de marché, rendant le choix du fournisseur et du moment d'achat critiques.
.png)
Les profits include a direct reduction in bills, strengthened budgetary forecasting and better control of consumption. Businesses gain visibility and efficiency thanks to adapted tools.
.png)
Farms are subject to taxes such as TICFE or TICGN. Sirenergies verifies their application, identifies cases of exemption and accompanies the procedures to reduce the tax burden.
.png)
L'ARENH est remplacé par le VNU (Versement Nucléaire Universel), un mécanisme de redistribution des revenus excédentaires d'EDF en cas de prix très élevés, et par les CAPN, des contrats long terme pour les gros industriels.
.png)
All businesses, from SMEs to large organizations, can benefit from this service. Les local authorities also find it a lever to better control their budgets.
.png)
Tertiary companies must manage their energy costs while guaranteeing the comfort of users (offices, shops, services). Consumption is often linked to heating, air conditioning and lighting, which requires precise monitoring to avoid budgetary excesses.
.png)
Some businesses may obtain a partial or total exemption from the TICFE or the TICGN, depending on their activity and energy intensity. The support of an expert makes it possible to identify the eligibility criteria and to put together the file.
.png)
Même le bâtiment le plus moderne et le mieux isolé perd son efficacité si ses usages sont inadaptés. La technologie et les normes ne suffisent pas : la transition énergétique est avant tout une transformation humaine.
Derrière chaque kilowattheure consommé se cache une habitude.
Un collaborateur sensibilisé comprend qu'ouvrir une fenêtre alors que le chauffage est allumé ou laisser un ordinateur en veille consomme de l'énergie inutilement. En replaçant l'humain au centre de la stratégie de gestion de l'énergie, l'entreprise s'assure que ses équipements performants sont utilisés de manière optimale, garantissant ainsi une rentabilité durable et un impact environnemental réduit.
.png)
Ce record de 92,3 TWh s'explique par la conjonction de trois facteurs :
.png)
The €/MWh is a price unit used in wholesale markets, while kWh is the unit visible on your bills.