Campsites and holiday villages

Tourism and leisure: campsites and holiday villages

Campsites: stop paying for August power levels in winter

In February, a closed campsite is still paying for the power capacity reserved for August 15th. From hook-up points and air-conditioned mobile homes to heated pool areas, washrooms, and restaurants, a campsite's energy usage is concentrated into just a few weeks. Sirenergies provides procurement advice and aligns your power capacity with your actual season.

Key industry figures

A short season, equipment that strains electricity and gas usage

Overnight stays are concentrated over four months, when pool areas, rental units, and hot water for washrooms are all running at once. Power capacity and procurement plans based on the entire year mean you pay premium prices in summer, then pay for nothing all winter.

85%

Share of 2025 campsite overnight stays occurring only between May and August.

1,047

French campsites equipped with an indoor pool requiring heating and dehumidification.

183 L

Liters of water consumed per overnight stay at a campsite, primarily in showers and washrooms.

The energy profile of a campsite

Pool areas, rentals, and pitches drive up the bill in summer

The reality: a village that lights up for the summer

A campsite operates like a small seasonal town. Electricity powers pitch hook-ups, air-conditioned mobile homes, pathway lighting, laundry facilities, and vehicle charging. The pool area adds water heating, whether via natural gas or heat pumps. The move toward higher-end facilities accentuates this profile: in the peak of summer 2025, 4 and 5-star campsites accounted for 61.4% of overnight stays (FNHPA based on INSEE data, 2026). Off-season, consumption plummets, yet subscription fees and power capacity charges remain on the bill.

‍

Our role: a contract adjusted for the season, not for habit

Your electricians and pool specialists remain in charge of the equipment; Sirenergies acts on three levers:

‍

  • The meter map: account holder, power, option, and expiration date for each delivery point.
  • Transmission: for loads over 36 kVA, a TURPE (public electricity network usage tariff) power gradient that reserves the highest capacity for the summer, and an ATRD (third-party access to gas distribution networks) option tailored to swimming pools.
  • Purchasing: a tender prepared in winter, which you finalize based on our recommendation, followed by D+1 monitoring in Pilott.
Tentes lodge d'un camping installées sous les pins au soleil couchant

Your energy challenges

The 3 energy challenges for campsites and holiday villages

A heated pool that opens in April, pitches and rental units that become more electrified from one season to the next, and a series of meters with options no one remembers: a campsite's energy bill is rarely where you expect it to be. Here are the three areas Sirenergies prioritizes, each with a specific contractual lever.

The problem

Subscribed power poorly calibrated for the season

A campsite consumes the bulk of its energy during July and August, making the calibration of subscribed power particularly sensitive between peak activity and the off-season.

Our solution

TURPE audit and seasonal adjustment of subscribed power

Sirenergies adjusts your subscribed power to your actual peak activity and verifies your TURPE settings.

flèche icon
The problem

Energy-intensive heated pool

A heated pool is one of the most significant energy consumers for a campsite or holiday village, between water heating, continuous filtration, and automated treatment.

Our solution

Energy audit for pool facilities

Sirenergies analyzes your contracts and load profiles to determine the true cost of your heated pool.

flèche icon
The problem

Contracts ill-suited to seasonal business

Standard electricity contracts are rarely designed for businesses concentrated over just a few months, which limits potential savings.

Our solution

Procurement and supplier tendering with contracts tailored to seasonality

Sirenergies puts our trusted partner suppliers in competition to provide offers that account for your seasonal profile.

flèche icon

Contractual and data expertise

Optimization and management of your campsite and holiday village contracts

From heated aquatic areas to pitch power hookups, Sirenergies analyzes, adjusts, and monitors your campsite's electricity and gas contracts. The starting point: your opening dates, your rental inventory, and your equipment plans, ensuring your contract keeps pace with the season rather than being dictated by it.

Contractual and capacity audit

Inventory of the campsite's delivery points including account holder, power, and expiration dates; monitoring of summer peak overages; and annual analysis of electricity excise duties (formerly TICFE), natural gas excise duties (formerly TICGN), and CEE energy savings certificates.

‍

→ Learn more

Purchasing strategy and competitive bidding

Tendering suppliers for electricity and gas for a single campsite or your entire network, with price fixing spread throughout the winter so you can approach the opening with known costs rather than in the middle of the season.

‍

→ Learn more

Distribution optimization (TURPE / ATRD)

TURPE: power gradient adjustment for loads over 36 kVA, or consolidation of small meters where justified. ATRD: gas options for pools, restrooms, and kitchens reviewed based on actual consumption. Network administrative procedures included.

‍

→ Learn more

Summer peak tariff modeling

Energy budget projections for the season based on occupancy, opening duration, and various price scenarios. The same simulation calculates the value of rooftop or carport solar self-consumption, which naturally peaks during the summer.

Pilott software platform

All campsite delivery points on a single dashboard: previous day's consumption, verified drop-off after closing, electricity and gas price alerts, projected budget, and centralized contract documents.

‍

→ Learn more

Expert consulting dedicated to campsites

A dedicated consultant who knows your opening dates and equipment plans, monitors markets and deadlines, keeps you informed of regulatory changes, and works with you to build an energy cost per occupied pitch, season after season.

‍

→ Learn more

Our platform

Pilott, simplified management to track your consumption

  • Bring reception, aquatic areas, restrooms, and rentals together on one screen
  • Verify at D+1 that consumption drops after closing
  • Get alerted before opening if electricity or gas prices cross your thresholds
  • Simulate your seasonal budget and keep all your contracts in one place
grand logo PILOTTdashboard

Methodology and definitions

What is energy consulting for a campsite?

When should you lock in electricity and gas prices for a site that is closed six months of the year? For a campsite or holiday village, energy consulting first answers this question: it helps the operator choose between fixed and market-indexed pricing, stagger price locking throughout the winter, and adjust distribution costs for the high season. Sirenergies consultants provide guidance and then monitor every meter via the Pilott platform.

‍

The context

France has 7,637 campsites, 77% of which are in rural areas (FNHPA and Asterès, 2026). Since the law of April 30, 2025, mandatory energy audits are based on the company's consumption, including fuel.

‍

Our method

  • A map of all your delivery points and their power capacities.
  • TURPE (public electricity grid usage tariff) power adjustments and ATRD (third-party access to gas distribution networks) options aligned with the summer season.
  • Consultation prepared in winter, followed by day-after monitoring in Pilott to compare seasons.
Visuel Sirenergies : une main signe un document contractuel avec un stylo